| SERFLEX |
| -Technological Installation Works of the New Plant 6000m2 |
|
|
Structural Steel Manufacturing and İnstallation Works
| -Modernization and Renewal Works for Old Plant : (Platforms, Pipelines, Equipment İnstallations) |
|
|
|
|
| SISTEM
YAPI |
Izmir Atatürk Industrial Zone Waste Water Treatment Plant, Mechanical Fabrication and İnstallation Works.
|
|
| Dismantling, Renewal and Relocation of Ash Conveyor & Zigot System of Yeniköy Thermal Power Plant |
|
| Thermal Power Plant Pressure Pump Station Equipment İnstallation and Piping Construction |
|
| Bafra/Samsun City Waste Water Treatmet Plant, Mechanical Fabrication and Installation Works. |
|
| Karabük Demirçelik Plant Tube Bridge and Pipe Lines Construction |
|
|
| SUSANBAS
DEGIRMENCILIK |
| Dismantling And Destruction of Factory Buildings |
|
|
|
| TEKFEN |
| 5000m³ x 2 Sphere Tank Colon Production |
|
|
| Akpet 5000m³ LPG Sphere Tank Fabrication |
|
|
| Sphere Tank Column Fabrication |
|
|
| Sphere column anchorage system |
|
|
| -3500 m3 Propan Spherical Tank And Pipework Erection For Aygaz-Samsun |
|
|
| Samsun – Aygaz Dolum
Tesisleri 3500 m3 Propan Küre Montajı |
|
| 3000 m3 LPG Tank And Pipeworks Erection For Akkim-Yalova |
|
|
|
| TESA |
| 1000m³ Spherical Tank Installation |
|
|
|
| The
International Federation of Red Cross & Red Crescent |
| Turn Key Construction of The Primary School Building |
|
|
|
| TOFAŞ. |
| Palio Albea Line Relocation |
|
|
| Mobile Loading Ramp Design and Fabrication( 9 Ton Capacity) |
|
|
|
| TOYOTA MOTOR MANUFACTURING TURKEY |
| 595 LRR Axle Line Demontage & Montage Works |
|
|
| Injection Plant Installation |
|
|
|
|
| Buffer Shop Lay-Out Change |
|
|
| Injection Machine Mechanical İnstallation |
|
|
| III Zone Utilities Installation |
|
|
| Buffer Injection Machine Assembly |
|
|
| III Zone Header Manufacturings |
|
|
| III Zone Utility Manufacturing and Installation |
|
|
| U/B Manifold Lay-Out System Construction |
|
|
| Crane Steel Structure Fabrication and Installation |
|
|
| III Zone Manifold System Fabrication and Installation |
|
|
|
|
|
| M/B Inspection Transfer Construction Fabrication and Installation |
|
|
| Lenghtening Of Fuel Tank Furnace |
|
|
| -10 Robot Stand Manufacturing |
|
|
| Modification of Welding Plant Fuel Tank Entrance Door |
|
|
| Manufacturing and Assembly of U/RR Carrier Chassis |
|
|
| U / B Final, M / B Tack, M / C, U / RR Axis Line and Level Settings |
|
|
| Structural Steel Hanged Systems, Yagura Manufacturing and Installation |
|
|
| Assembly Plant Oil, Diesel, Petrol Filling Pipe Lines |
|
|
| Fabrication and Installation of Splitting Division in Paint Hall |
|
|
| Header Systems Manufacturing and Assembly |
|
|
| Gunpoles Manufacture and Installation |
|
|
| S/B Line Change Over Line Construction |
|
|
| M / B Manufacturing and Assembly Respot Station |
|
|
|
|
| Assembly of Body Shapes Control Fixtures |
|
|
| Disassembly, Re-location, New Line Assembly of Body Manufacturing Machines |
|
|
|
| TUPRAS |
İzmir Refinery 2x3.500 m³ and 3x5.000 m³ Spherical Tank Welding Repair Maintenance |
|
| İzmir Refinery 2x3.500 m³ and 3x5.000 m³ Spherical Tank Strengthening |
|
|
| VITS SYSTEM GbmH. |
Hot Oil Piping System Fabrication and Installation |
|
|
| YAMATA |
| Structural Steel Manufacturings for Russia Anadyr Library |
|
|
| Structural Steel Roofing For The Yamata Building |
|
|
| Dismantling and Relocation of The Existing Fire Stairs of the Yamata Building |
|
|
| Structural Steel Equipment Plinth Fabrication and Installation Works for the Yamata Building |
|
|
| |
|
|
|
|